![]() A/S Norske Shell continues to be the Technical Service Provider of the Nyhamna Gas Processing Plant, and partner in the Norwegian Full Scale CCS project Northern Lights and CCS test facility at Mongstad. Generally speaking, a shift runs from 07.00 to 19.00, and from 19.00 to 07.00. They do 12-hour shifts, either day or night, and their working hours over a year compare with those of an industrial worker on land. Shell maintains a presence in Norway, including as operator of Ormen Lange and Knarr and as partner in Troll, Valemon and Kvitebjørn. Draugen employees work offshore for two weeks, followed by four weeks off on land. OKEA’s CEO Erik Haugane, said, “This is the beginning of a new chapter for OKEA, as Operator of one of the most prestigious fields on the NCS.” It was made possible by good collaboration between Shell and OKEA and with constructive dialogue with the Norwegian Authorities,” said Rich Denny, Managing Director of A/S Norske Shell. The Njord licensees are Wintershall Dea Norge AS (50 percent), Equinor Energy AS (27. ![]() It had then assessed many different platform solutions since the second appraisal well in August 1985. ![]() Production began in October 1993 via a fixed concrete platform with an integrated deck. The unique Draugen platform person Finn Harald Sandberg Norwegian Petroleum Museum Shell declared the Draugen field commercial in May 1987. Draugen is an oil field around 150 km (93 mi) north of Kristiansand. “Today’s deal completion was achieved despite a tight timeline from the Sales and Purchase Agreement in June 2018. Plans call for future partial electrification of the Njord field based on power from shore via the Norwegian Sea Draugen platform, thereby reducing annual CO 2 emissions by around 130,000 tonnes. OSLO, Norway Petroleum Safety Authority (PSA) Norway has approved A/S Norske Shell’s request to extend the lifespan of the Draugen complex in the Norwegian Sea. One-hundred-fifty-three staff will transfer from Shell to OKEA on their contracts of employment and with full continuity of service. Norske Shells Draugen platform, which is located in block 6407/9 in the Norwegian Sea. Draugen was discovered in 1984 by Shell, the plan for development and operation (PDO) was approved in 1988, and with production start in 1993. The water depth in the area is 250 metres. Saga Petroleum found gas in the Midgard field in 1981 with its third well in the area, while Statoil and Shell discovered Smørbukk and Draugen respectively in 1984. Draugen is an oil field with associated gas in the southern part of the Norwegian sea. The deal is part of Shell's global $30 billion divestment program and will see the supermajor exits its 44.56 percent operated interest in the Draugen field in the southern part of the Norwegian Sea and 12 percent non-operated interest in the Gjøa field in the northern part of the North Sea, representing approximately 14 percent of A/S Norske Shell’s total production in 2017. After exploration drilling was permitted above the 62nd parallel (the northern limit of the North Sea) in 1980, a number of discoveries were made on the Halten Bank. A/S Norske Shell has completed the sale of its interests in the Draugen and Gjøa offshore fields in Norway for 4.52 Billion NOK (US$526 million) to Norwegian focused OKEA AS.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |